Test and Commissioning

Test and Commissioning

As VERA Elektromekanik, we are able to produce solutions on the basis of plan and layout by our expert engineers and technical staff, with test devices in accordance with international standards, for all kinds of electrical and automation assembly services from the feasibility and project stage of an industrial facility to the testing and commissioning stage.

Testing and commissioning is the last point in the realization of a project, and the field tests of all equipment before energizing are carried out and reported in accordance with the procedures, the electrical devices are made operational and the system is put into operation. Correct testing and commissioning is the most important step for the long-term problem-free operation of the business. Your protection systems will not work properly in incorrect or incomplete testing and commissioning. Ineffective functioning of the protection systems, your electrical system and all equipment working with electrical energy pose a risk.

Röle Test

Protection and Control Relay Tests

  • Distance protection relay tests
  • Overcurrent and ground relay tests
  • Directional overcurrent and directional ground relay tests
  • Low and high voltage relay tests
  • Low and high frequency relay tests
  • Differential relay tests
  • Busbar protection relay tests
  • Meter and power analyzer tests
  • Unbalanced load relay
  • Sync control relay tests
  • Measurement tests
 

Grounding Measurements
It is a system that must be installed in electrical facilities in order to ensure the healthy operation of electrical devices and to complete the circuit of leakage and short-circuit currents that may occur in the event of insulation faults in the shortest way. By making grounding calculations of the facility; The accuracy of the grounding system made by measurement is checked.
Ground Resistivity Tests

  • Grounding Dissipation Resistance Tests
    • Operational Grounding
    • Protection Grounding
    • Lightning Rod Grounding
    • Surge Arrester Grounding

  • Grounding Impedance Tests
    • Measuring Impedance
    • Measuring Step Voltage
    • Touch Voltage Measurement
    POWER TRANSFORMER TESTS
  • CAPACITY AND %PF TESTS
  • INSULATION RESISTANCE TESTS
  • EXCITATION CURRENT MEASURING
  • BUSHING TESTS
  • CONVERSION RATIO TESTS
  • WINDING DC RESISTANCE TESTS
    CURRENT TRANSFORMER TESTS
  • CAPACITY AND %PF TESTS
  • INSULATION RESISTANCE TESTS
  • CURRENT CONVERSION RATIO TESTS
  • POLARITY TESTS
  • SATURATION TESTS
  • WINDING RESISTANCE TESTS
  • LOAD TESTS
    VOLTAGE TRANSFORMER TESTS
  • CAPACITY AND %PF TESTS
  • INSULATION RESISTANCE TESTS
  • EXCITATION CURRENT TESTS
  • VOLTAGE CONVERSION RATIO TESTS
  • LOAD TESTS
    CIRCUIT BREAKER TESTS
  • CONTACT CAPACITY AND %PF TESTS
  • INSULATION RESISTANCE TESTS
  • IGNITION TRANSITION RESISTANCE TESTS
  • BREAKER ON-CLOSE TIME TESTS
    SEPARATOR TESTS
  • INSULATION RESISTANCE TESTS
  • IGNITION TRANSITION RESISTANCE TESTS
    SPD TESTS
  • CAPACITY AND WATT LOSS TESTS
  • ISOLATION TESTS
  • GROUNDING RESISTANCE MEASUREMENT
    GROUNDING TESTS
  • GROUND TRANSITION RESISTANCE MEASUREMENT WITH SELVAZ METHOD
  • MEASUREMENT OF SOIL RESISTANCE
  • MEASUREMENT OF STEP VOLTAGE
  • MEASURING THE CONTACT VOLTAGE
    BUSBAR AND CABLE TESTS
  • CABLE ISOLATION TESTS
  • CABLE HI-POT (AC-DC) (LEAKAGE CURRENT) TESTS
  • BUSBAR INSULATION TESTS
  • BUSBAR HI-POT (AC-DC) (LEAKAGE CURRENT) TESTS
  • CABLE END CONTROL TESTS
  • FUNCTION TESTS and COMMISSIONING STUDIES
 

PHOTOS

 

Test and Commissioning
Test and Commissioning
Test and Commissioning
Test and Commissioning
Test and Commissioning
Test and Commissioning
Test and Commissioning
1
Follow us
LinkedinYoutubeInstagram
© Vera Electromechanic 2019 All Rights Reserved.
The materials used on the site belong to Vera Electromechanic. Can not be used without permission, can not be reproduced.
Contact
İvedik O.S.B 1468.Street 2239/1.Street No:1 06378 Ostim ANKARA TURKEY
+90 312 394 54 64 (pbx)
+90 312 394 77 97
info@veraelektromekanik.com